HomeKnowledge centreHow to prepare an IFC model for a review with the client
Guide / BIM and IFC model review

How to prepare an IFC model for a review with the client

Will a maintenance engineer be able to remove an air handling unit’s filter after installation? To answer that question, the client and designer need current geometry, the manufacturer’s service clearance and a decision record that identifies the exact unit.

Which information does the decision require?

A maintenance review needs the equipment location, outline and neighbouring services. A façade decision needs materials and comparable views. Write one sentence describing the outcome required from the meeting. Use it to select disciplines, levels and properties, and assign someone to supply any missing information.

What should you check after exporting IFC?

IFC is an open standard for describing built assets, properties and relationships. Agree a supported version and open a sample in the review tool. Check a known dimension, the storey and several object properties. When combining disciplines, verify a shared reference point before treating an apparent displacement as a design clash.

How do you hand a comment back to the designer?

Record the revision, element identifier, viewpoint and requested action. For example, “Check the clearance between cabinet S-12’s fully open door and the cable tray.” If both tools support BIM Collaboration Format (BCF), use it to share the issue and viewpoint. Exchange the model separately, for example in IFC.

When is the model ready for the client?

Ask someone outside the modelling team to locate the item without help. IFC validation checks conformance to the standard; verify project dimensions and required data separately. For RUVRE or another 3D tool, test a representative file and establish how the scene will be prepared and which properties will be available.

How do you run a shared review in RUVRE?

Start with a decision, such as whether there is room to replace an air handling unit’s filter. Follow the presenter’s viewpoint, use a section to expose the unit and measure the clearance. Compare it with the service manual, annotate the component and record who will check the agreed change.

What should the review include?

DecisionMaterial for the meetingRecord after the review
Access to a services cabinetAccess route, door opening angle and clear passage width.Selected option, cabinet ID and required revision.
Services routingSection showing both disciplines at the same elevation.Object identifiers and person responsible for the change.
Finish selectionTwo views from the same position and material references.Approved option and model revision.

Example: reviewing a plant room

The client wants to know whether maintenance staff can replace a filter. The designer identifies the service side and compares available space with the manufacturer’s required clearance. Record the unit ID, dimensional reference and decision to move the adjacent service. Revisit that location in the next revision.

Checklist

  • The decision, scope and model revision are agreed.
  • The sample opens in the target tool.
  • Scale and alignment between disciplines have been checked.
  • Each issue identifies an element and a responsible person.

Related solution

Review the scope and prepare your questions for an initial discussion.

Explore digital twins for buildings
Contact

Let’s talk about your IT.

Get in touch
Images and credits
Images and credits
  • Three-dimensional building model · Illustration generated for the VESCOM website.
  • The VESCOM logo and visual identity are from VESCOM’s corporate materials.